Project

Georgetown United Methodist

SKY Engineering designed HVAC, plumbing, and fire protection for a new facility with classrooms, kitchen, and gym, featuring gas-fired units, exhaust fans, and fire sprinkler systems.

Overview

Seven gas-fired Trane HVAC units were provided for the new building to serve nine classrooms, two restrooms, kitchen and gymnasium. Ductwork in the gymnasium was equipped with duct vents and all exposed ductwork was painted to match the ceiling as recommended by the architect. Exhaust fans were provided for the restrooms and kitchen hood.

SKY Engineering was also contracted to provide plumbing and fire protection plans. A new 6” fire riser was installed behind the mechanical room in the gymnasium along with a new fire sprinkler inside the mechanical room. The plumbing plan mapped out new water lines to serve five restrooms (two included a shower), the kitchen equipment, mop basin, and drinking fountains.

Client

Georgetown United Methodist

Date

December 2019

Services

Mechanical
Plumbing
Electrical
Let’s build your vision together.

We bring your vision to life with care and craftsmanship—guided by integrity, compassion, and humility every step of the way.

Return to

Religious